Installation And Maintenance Of Feeding Machines

Mar 10, 2023

a. If the feeder is used for batching and quantitative feeding, in order to ensure the uniform and stable feeding of the feeding, to prevent the self-flow of materials should be installed horizontally, such as continuous feeding of general materials, it can be installed at a downward tilt of 10°. For viscous materials and materials with large water content, it can be installed at a downward tilt of 15°.


b. After installation, the feeder should have a swimming gap of 20mm, the transverse should be horizontal, and the suspension device should be flexibly connected.


c. Before the air test, all bolts should be strengthened once, especially the vibrating electromagnetic anchor bolts, which run continuously for 3-5 hours and should be re-tightened once.


d. During the test run, the two vibration motors must rotate in the direction.


e. The stability of amplitude, current and noise should be checked frequently during operation during feeding, and abnormal should be stopped in time.

 

f. Electromagnetic bearings should be filled with lubricating oil every 2 months, and lubricating oil should be filled once a month in the high temperature season.

 